Serialised builds, certified hands and sole-source parts, planned so acceptance dates hold.

Low volumes, routings that run to dozens of operations, and parts with one approved source and a lead time in months. Every unit is serialised and built to a controlled configuration. Welds, torques and inspections need qualified signatures. Lots leave site for heat treat, plating or NDT and wait in someone else’s queue. Orvixo holds all of it in one model and re-plans each serial when anything moves, with the reasoning written down for the programme office.

What makes defence hard to plan

Every unit is its own record

Each serial has a build record, its own inspection points and its own place in the delivery schedule. It is built to a controlled configuration, so a change note or a concession can alter the routing of one unit and not the next. There is no averaging across a batch.

Signatures are a resource

Welds, torques, crimps and inspections are done and stamped by qualified people. Some are security cleared; some are the only approved person on site. The bottleneck is a person’s calendar as often as a machine’s.

Material comes from one approved source

A casting or a forging with a single approved supplier and a lead time in months sits on the critical path of every unit that needs it. Some of it is export controlled or government furnished. None of it can be substituted without a concession.

Special processes leave the building

Heat treat, plating, painting and NDT often run at an approved subcontractor with a queue of its own. A lot that leaves mid-routing comes back when the processor says so, and every operation behind it waits.

Routings are long and branching

Dozens of operations, with inspection gates, rework loops and first-article checks between them. A slip in week two is felt at acceptance in week twenty.

The customer schedule is fixed

Programme milestones and acceptance dates are contractual. When something moves, the plan has to, and the programme office wants to know what changed, and why, before a new date is promised.

How Orvixo plans it

One plan per serial

Each unit is planned through its own routing, at its own configuration, with inspections, rework loops and first-article checks as operations in the model.

Qualification as a constraint

Approved welders, fitters and inspectors are resources with rosters and clearances. Work is only placed where the right stamp will be available, and an approval about to expire shows up before it costs a slot.

Approved sources and lead times in the model

Sole-source and long-lead parts are tracked against their promised dates. When a delivery slips, the serials it feeds re-plan and the milestone at risk is named.

Subcontract processes as capacity, not a gap

NDT, plating and heat treat at an approved subcontractor are modelled with their turnaround and transport. The plan times when a lot leaves so it comes back to a cell and a person that are ready for it.

Bottlenecks visible weeks out

Load on each test cell, each scarce inspector and each subcontractor is solved by week, so the constraint that will cost a delivery is visible while there is still time to move it.

Re-plan with the reasoning written down

Every move is explained: which rule, which resource, which serial. Your planners review and publish, or let Orvixo publish within your rules. The programme office gets a plan it can read.

Rules we typically learn

The ones your best planner already knows.

Written in plain language by your team, compiled by Orvixo into constraints the plan must respect. These are the ones we see in most serialised build programmes.

Weld and torque operations need an approved operator and an inspector’s stampcertification
Rework on a unit returns to the same cell and, where possible, the same operatorrouting
Castings from the approved source only; no substitute without a signed concessionsupply
Heat treat goes to the approved subcontractor; plan their quoted turnaround plus two dayssubcontract
Export-controlled material stays in the bonded store; only authorised staff draw itsecurity
First-article inspection on any new configuration before the next serial is releasedquality
Acceptance dates are hard; internal milestones are softpriority
Kitting is complete and checked 24 hours before a build startssequence
Nothing moves after the weekly programme review is signedfrozen