Die changes, colour blocks and a call-off that moved at 06:00, planned together.

A tier-1 plant runs to someone else’s schedule. EDI releases move the week’s call-offs, dies fit some presses and not others, paint runs in colour blocks, and a late rack means premium freight or a line-stop charge. Orvixo holds every rule your plant runs on and re-solves the press, weld and paint plan when a release changes or a press goes down. Tooling, operators and the frozen window are respected, and the reasoning is written down for the shift lead.

What makes automotive hard to plan

Changeover depends on what ran before

A die change on a big press is measured in hours. A dark-to-light colour change costs more purge than light-to-dark. Setup is not a fixed overhead per job; it is a function of the sequence, so the order of the week decides how much capacity the week has.

The call-off is not a forecast

OEM releases arrive by EDI: a planning schedule out to the horizon, then firm daily call-offs, and for sequenced parts a broadcast that fixes the build order. Quantities change inside the week. Miss a slot and you pay premium freight; stop their line and you pay for that too.

Dies and presses are a compatibility matrix

A die fits a press with the right bed and tonnage, and one or two presses hold the only alternates. Dies wear too: after so many hits they go to the toolroom. Two jobs that each fit a press may not fit the plant in the same shift.

People are certified, not interchangeable

A press family needs a Level-3 operator; a die change needs a setter; a weld cell needs a welder approved to the customer’s spec. The constraint at 02:00 is who is on nights, not which machine is idle.

Coil, blanks and racks are part of the plan

Steel arrives as coil by grade and gauge. Blanks are cut ahead. Finished parts leave in returnable racks the customer controls. Run out of any of them and the press stands idle with an operator on it.

The frozen window is a promise

What has been published to the floor is what the setters, the material handlers and the customer’s dock plan against. A re-plan has to work around it, not through it.

How Orvixo plans it

Setup as a sequence matrix

Changeover time is modelled per transition: die to die, colour to colour, coil to coil. The plan groups runs to cut setups where it can and spends one only when it buys something, such as a call-off shipped in sequence.

Releases in the model

The customer’s releases and sequence broadcasts are constraints, not a spreadsheet beside the plan. When a call-off changes, the plan re-solves to the new quantities and dates and shows the slack left on every dock time.

Tooling, presses and alternates solved together

Dies and fixtures are resources with calendars, compatibility and hit counts. When a press fails, work moves to a press that can take the die, has a setter on shift and is not due for maintenance.

Certification-aware assignment

Operator approvals and rosters are in the model, so a run is only placed where someone certified will be present. Move it to nights and the plan checks the night crew, not the day one.

Colour blocks and kanban loops kept whole

Paint runs in blocks with a maximum number of colour changes per shift. Weld and sub-assembly feed the line through kanban loops with a fixed number of racks. Both are rules, so a re-plan never splits a block or overfills a loop.

Re-solve around the frozen window

Published work is pinned. Everything after it re-solves in seconds when a press stops or a release moves, and each move is written down: which rule, which resource, which call-off. Your shift lead reviews and publishes, or Orvixo publishes within the rules you set.

Rules we typically learn

The ones your best planner already knows.

Written in plain language by your team, compiled by Orvixo into constraints the plan must respect. These are the ones we see in most tier-1 press, weld and paint plants.

Die 204R runs only on PR-27 or PR-28; 35-minute change with a setter on shiftchangeover
Level-3 operators only on the PR-27 press family; two for runs over four hourscertification
Paint L2: light before dark, no more than two colour changes a shiftsequence
Sequenced parts load in broadcast order; a rack never re-orders once closedsequence
48-hour frozen window; the published sequence does not move without the shift leadfrozen
OEM dock 2211 is never late twice in a month; premium freight needs a sign-offpriority
Coil for a blanking run must be on site before the run is releasedsupply
No production run on a new or reworked die before PPAP sign-offquality
MP-51 is down for planned maintenance on Saturday nightscalendar